一、在预定位置钉好室内机的挂盘(必须保证水平),将管穿出后挂好室内机。
I. nail the hanging plate of the indoor unit at the predetermined
position (the level must be ensured), and hang the indoor unit after the
pipe is threaded out.
二、根据管的长度确定室外机的位置,室外
流水槽钢模具 不锈钢铸件 扭王字块模具 井盖钢模具 标志桩模具 调匝式消弧线圈 风冷控制柜 烤漆龙骨机也要保证水平。
2. Determine the location of outdoor unit according to the length of pipe, and ensure the level of outdoor unit.
三、接好高低压管,先打开高压阀,然后松低压管锁母(排出管路中的空气),听到有出气的声音8~10秒后拧紧该锁母,打开低压阀,按顺序接好电线。
3. Connect the high-pressure and low-pressure pipes, first open the
high-pressure valve, then loosen the lock nut of the low-pressure pipe
(discharge the air in the pipe), hear the sound of air outlet, and then
tighten the lock nut after 8-10 seconds, open the low-pressure valve,
and connect the wires in sequence.
四、接通电源,试机。检查管路接头(锁母处)有无泄漏。
4. Connect the power supply and test the machine. Check the pipe joint (lock nut) for leakag